Glossary


Capacitysearch for term
The design maximum flow, or loading, that a wastewater system and its components can handle in a specified period of time with predictable and consistent performance. Also, the peak flow is equal to the maximum flow only when the time periods are the same. Maximum flow may be greater than or equal to the peak flow.